Other information:
Repair procedures
Removal
[2WD Lateral arm]
1.
Remove wheel nuts, front wheel and tire (A) from hub.
Tightening torque:
107.9 - 127.5 N·m (11.0 - 13.0 kgf·m, 79.6 - 94.0 lb·ft)
...
Description and operation
Desrcription
Installed on the turbocharger, the Electric Waste Gate Actuator (EWGA) operates
the vane in the Waste Gate Turbocharger (WGT) and regulates the compressed air amount
based on the PWM signal from the ECM. This actuator consists of a DC motor wh ...